0 Items | AUD $0.00 | Checkout >

The Process of using concrete tilt up as construction method can speed up the construction time of larger buildings.

  • Concrete panels can either be made on site or fabricated off site and delivered and craned into place. It allow for the walls to be created in one area while footings and other construction to continue unobstructed. 
  • Tilt up is not necessarily cheaper.
  • The beauty of this is that when the walls arrive on site they are generally erected in 2 - 3 days ready for the structural steel work to be fitted.

This process is very good but needs to be well managed or the time that is saved can be easily lost, good management makes all the difference.

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Located at 78 Essington Lewis Ave Whyalla - Open 8.30AM - 5PM Weekdays
Located at Moran St Whyalla, Open 8AM - 5PM Weekdays - Window, Security Doors, Roller Doors, Roller Shutters, Kitchens, Building Work
HIA Members
Home   |   About Us   |   Online Store   |   Services   |   Contact Us   |   Privacy   |   Disclaimer   |   Your Account   |   Shipping Information   |   Customer Service & Refunds   |   Security Policy   |   Links
© NJ & T McMullen 2019   |   ABN: 29 008 166 747   |   Builders license: BLD 54620   |   Website by Static Fiction